Seneca

Flooding Case Study: Responses to Boscastle

Geography: KS3, topic 8.2.6

Responses to the Boscastle Flash Flood in 2004

There were immediate and long-term responses to the Boscastle flash flood. The flood happened on 16th August, 2004.

New bridge with a higher arch

New bridge with a higher arch

  • The height of the bridge's arch was increased.
  • The increased arch should stop the bridge from becoming a dam if flooding happens again.
Deeper and wider river channel

Deeper and wider river channel

  • A new £10 million scheme tried to stop the flooding happening again.
  • The River Valency was widened by 3 metres.
  • The river was lowered by 2 metres.
  • 3 gauges were added to monitor water levels.
Rebuilding

Rebuilding

  • Buildings and roads had to be rebuilt.
Emergency rescues

Emergency rescues

  • Evacuation was difficult because the flooding happened so fast.
  • 100 people were airlifted to safety.
  • Nobody died.
Temporary accommodation

Temporary accommodation

  • People whose accommodation got flooded were put up in temporary accommodation.

Test yourself on Flooding Case Study: Responses to Boscastle

  • What was the value of the new scheme set up to stop the Boscastle flooding happening again?

  • What happened to the arch of the new bridge in Boscastle?

  • What happened to the River Valency after the Boscastle flood?

  • What happened to people after their homes flooded?

  • Pick the true statement about the Boscastle flood.

Practise this topic for free