Flooding Case Study: Boscastle
Geography: KS3, topic 8.2.4
What Caused The 2004 Boscastle Flash Flood?
On the 16th of August 2004, there was a flash flood in Boscastle (in Cornwall).

Removal of vegetation
- Trees and plants upstream of Boscastle were removed.
- The removal raised surface runoff.

Steep relief
- Boscastle is in a very steep valley.
- The steep valley means surface runoff is high and fast.
- The steep valley acted like a funnel, channelling all of the rain into Boscastle.

The low bridge in Boscastle
- A bridge over the River Valency in Boscastle was not very tall.
- The bridge had a low arch.

Debris created a dam
- When the flash flood came, cars and debris became stuck under the arch.
- The stuck cars and debris created a dam.
- The dam led to even worse flooding.

Intense rainfall
- 200mm of rainfall fell in 24 hours (monthly average was 75mm).
- Between 50mm and 100mm fell in a few hours.
- July and August 2004 had been rainy.
- So there was already a lot of surface runoff.

Lack of flood defences
- Boscastle had no flood defences.
- The lack of flood defences meant Boscastle was vulnerable to very heavy rainfall.
Test yourself on Flooding Case Study: Boscastle
When did a severe flash flood hit Boscastle, in Cornwall?
How much rain fell on Boscastle in a few hours, just before the 2004 flash flood?
Choose the true fact about Boscastle's valley.
If trees stay in Boscastle's valley, what happens to runoff?
If Boscastle has flood defences, what happens to the village during a storm?