Flood Management: Soft Engineering
Geography: KS3, topic 8.2.3
Flood Defences - Soft Engineering
Soft engineering strategies aim to reduce the effects of flooding. Soft engineering strategies use our knowledge of nature and the natural courses of rivers.

Flood warnings
- Floods are more likely after heavy rainfall.
- Floods are also more likely when river levels are high.
- The Environment Agency and government send out flood warnings.
- Warnings let people protect homes, reduce flood damage, or leave if needed.
- Not all people watch the news and may miss flood warnings.
- Warnings cannot prevent floods.

Flood plain zoning
- Flood plain zoning stops building in high-risk zones of a flood plain.
- Fewer impermeable surfaces mean lower surface runoff.
- Lower runoff also means flooding is less common.
- But flood plain zoning means smaller towns and cities.
- Smaller towns and cities can raise house prices and cause housing shortages.

Planting trees
- Planting trees in river basins increases rain interception.
- Trees also increase the lag time between peak rainfall and peak discharge.
- River discharge, flood risk, and soil erosion are all reduced.
- Wildlife can also create homes in the trees.
- Planting trees leaves less space for building houses or farms.

River restoration
- River restoration returns a river to its natural state.
- River restoration allows a river to swell its banks and flood the flood plain naturally.
- River restoration does not do much to stop flooding.
- River restoration feels a bit like a passive approach, similar to managed retreat.

Preparation
- Adapting buildings can reduce flood damage.
- Stilt houses are an example of adapted buildings.
- Preparation should reduce the financial and personal impact of flooding.
- Stilts can be expensive.
- But valuables on the second floor could also count as preparation.
- Sandbags by your door could also count as preparation.
Test yourself on Flood Management: Soft Engineering
Pick the true statement in each pair.
What do we call it when building is restricted on parts of a flood plain that are at high risk?
Pick the true statement in each pair.
Flood plain zoning and planting trees both reduce flood risk. What disadvantage do these two methods share?