Managing Flooding - Hard Engineering
Geography: Cambridge International GCSE (2027 Exams), topic 2.3.2
Flood Defences - Hard Engineering
Hard engineering cuts flood risk by making structures. Man-made structures guide a river's flow.

Dams and reservoirs
- A dam is an earth, stone or concrete wall across a river's upper course.
- Behind the dam, a reservoir (man-made lake) forms.
- Reservoirs cut flood risk by storing rainwater.
- Dams are expensive to build.
- Flooding to create a reservoir can destroy habitats and towns.
- Soil downstream loses fertility as minerals settle in the reservoir.

Channel straightening
- Bends and meanders are removed.
- Straight, man-made channels link the meanders instead.
- Straight channels reduce flood risk by keeping water moving fast.
- Downstream areas face more floods and erosion.
- More water flows downstream faster.

Embankments
- Embankments are walls built either side of the river channel.
- The walls raise the height of the banks.
- Embankments reduce flooding risk by increasing the capacity of the river.
- Embankments are expensive to build.
- If the banks burst, flooding can still happen.

Flood relief channels
- Flood relief channels are extra channels built beside rivers.
- The channels divert water away during heavy rainfall.
- River discharge, the amount of water passing a point, falls.
- River discharge increases at the point where the relief channel joins the main river.
Test yourself on Managing Flooding - Hard Engineering
What do we call a large wall built across a river in the upper course?
What happens to soil fertility downstream of a reservoir?