Case Study: Boscastle
Geography: AQA GCSE, topic 3.3.20
What Caused The 2004 Boscastle Flash Flood?
On the 16th of August 2004, there was a flash flood in Boscastle (in Cornwall).

Removal of vegetation
- Trees and plants upstream of Boscastle were removed.
- The removal raised surface runoff.

Steep relief
- Boscastle is in a very steep valley.
- The steep valley means surface runoff is high and fast.
- The steep valley acted like a funnel, channelling all of the rain into Boscastle.

The low bridge in Boscastle
- A bridge over the River Valency in Boscastle was not very tall.
- The bridge had a low arch.

Debris created a dam
- When the flash flood came, cars and debris became stuck under the arch.
- The stuck cars and debris created a dam.
- The dam led to even worse flooding.

Intense rainfall
- 200mm of rainfall fell in 24 hours (monthly average was 75mm).
- Between 50mm and 100mm fell in a few hours.
- July and August 2004 had been rainy.
- So there was already a lot of surface runoff.

Lack of flood defences
- Boscastle had no flood defences.
- The lack of flood defences meant Boscastle was vulnerable to very heavy rainfall.
Test yourself on Case Study: Boscastle
When did a severe flash flood hit Boscastle, in Cornwall?
How much rain fell on Boscastle in a few hours, just before the 2004 flash flood?
Before the storm, July and August 2004 had been very rainy. This meant the ground already had lots of surface runoff. If these months had been dry instead, what would most likely happen to surface runoff during the storm?
Boscastle's average rainfall for a whole month is normally about 75mm. During the storm on 16th August 2004, around 200mm of rain fell in just 24 hours. What does this comparison suggest about the storm?
Select the true statement about the Boscastle flood in 2004.